Products

Sewer Systems

Problem: Deteriorated lengths of sanitary or process sewer pipe.

Solution: Rehabilitation to reduce infiltration and inflow is critical to managing treatment costs. Rehabilitation to prevent exfiltration protects the environment from the waste stream. In either situation, PolySpray Built-in-Place Pipe (BIPP) applied remotely and without excavation is the preferred solution.

Advantages:


Problem: Joint leakage or localized cracking of sanitary or process sewer pipe.

Solution: The HydraTite Seal is used at the joint area to stop infiltration or exfiltration. The seal can be interlocked to repair localized cracking.

Advantages:


Problem: Infiltration and inflow at manholes.

Solution: Chemical grouting and coating with PolySpray is the most effective solution.

Advantages: